Question 1
- 
        - 
            (a) State three preliminary site operations. 
 (b) Sketch the isometric view of each of the following types of purpose made bricks:(i) bevelled closer; 
 (ii) double bullnose.(c) Sketch a hollow sandcrete block and label the following parts: 
 (i) arris;
 (ii) web.
 
- 
            
Observation
Most candidates were able to:
-           sketch the isometric view of the  purpose made bricks that is, bevelled closer and double bullnose;
-           sketch  a hollow sandcrete block and label arris and web. 
 However, few candidates  were unable to state the three preliminary site  
Operations. 
The expected response to question 1 is as given below:
      1(a)      Preliminary site operations:
      -           site  clearing (i.e, removal of existing structures, tree roots/stump, top soil 
      excavation etc);
      -           site  levelling (i.e, cut and fill);
      -           provision  of access road;
      -           provision  of site offices for personnels;
      -           provision  of site workshops for trade personnels;
      -           provision  of storage facilities for materials;
      -           provision  of plant and equipment;
      -           site  planning;
      -           site organisation;
      -           site layout;
      -           provision of welfare facilities  (i.e, canteen, temporary toilet, bathroom etc.)
      -           provision of First – Aid facility;
      -           ensuring site  safety and security, e.g fence, gateman,  watchman etc;
      -           site  investigation.        
(b) Sketches of purpose – made bricks
(c) Sketch of a sandcrete block
