The following were expected from the candidates:
(i) ability to visualize tile complete assembly
(ii) use of suitable scale
(iii) accurate measurement
(iv) good pencil work.
(v) Use suitable lines to project the front elevation
(vi) Draw the sectional plan
(vii) Use suitable hatch line to section the front elevation (viii) Draw the complete plan"